Project Details: Construction of an 18’ diameter by 30” deep cast-in-place master quadraplex sewer pump station with submersible pumps. Included 18” and 30” gravity sewer with manholes, 12” and 20” force main, odor control system, jib crane, generator and associated sitework.
Project Highlight: New lift station was constructed adjacent to the existing lift station until the final conversion could take place.
Specializing in clearing, grading, storm drain, water systems, sanitary sewer, roadway construction, and water & wastewater treatment plant construction.